image/svg+xml
MW
MW
MW

Existing 330kV lines

Planned 330kV lines

Moving energy
High voltage power transmission and servicing the 330kV and 110kV power transmission lines in the Territory of Latvia

Existing 330kV lines

Planned 330kV lines

Events
Development

The State Construction Control Bureau (BKVB) has commissioned the development project "Estonia-Latvia third 330 kV interconnection" implemented by the Latvian electricity transmission system…

Development

The three transmission system operators of the Baltic States - Estonia 's "Elering", Latvia' s "Augstsprieguma tīkls" and Lithuania 's "Litgrid" are inviting the market participants to express…

News

For the first time, the international credit rating agency S&P Global Ratings (S&P) has assessed and assigned the Latvian transmission system operator AS Augstsprieguma…

Development

On September 30, 2020, AS "Augstsprieguma tīkls", together with other Baltic TSOs, published a jointly developed description of the Baltic Load Frequency Control (LFC) concept with the aim to…

Development
Management and development of the Latvian transmission system and its integration into the European energy system.
Services
We provide all market players with equal access to the transmission network and with transmission services according to the defined transmission service rates.
Technical expertise and diagnostics
Diagnostics and expertise of technical condition and characteristic values of the electric safety means, power systems and electrical equipment, environmental parameter testing.
Connections to the transmission system
Arranging system connections for electricity Users and Producers. Increasing the permitted load of existing connections.
Balancing and other ancillary services
Balancing and other ancillary services
System use, Balance and Balance service agreement templates and relevant terms and conditions. Information on imbalance administration costs
Requesting EIC
Granting and issue of energy identification codes.