Power system state

Please note that the data presented on this page is not completely accurate and instantaneous. Our purpose with this page is to illustrate phenomenon in the electricity system and provide insight into the work in our real control room. If you have other requirements for electricity market data, we recommend the ENTSO-E Transparency platform.

In case of any doubts, questions or inaccuracies, please contact us at [email protected]

Latvian and cross-border electricity flows
image/svg+xml
MW
MW

Existing 330kV lines

From Latvia
To Latvia
View detailsClose
Actual frequency
49.8 50 50.2
Updated:
State of Latvian power system, MW
Scheduled and actual consumption, net exchange and production
Types of production

"Solar Power Forecast - TSO" - a day-ahead forecast developed by AST for the total electricity injected into the grid from all solar power plants. The forecast is updated three times per day (at 09:00, 15:00, 21:00) using geospatial weather data provided by meteorological services, information on the installed capacities of solar power plants, and historical volumes of electricity injected into the grid.

"Solar Power Forecast - BRP" - data from the balance responsible parties (BRPs) on solar power plant generation, including day‑ahead plan data (collected daily until 16:00) and intraday plan data. 

 

The information contained in this section is provided for informational and educational purposes only. Nothing contained in this section is to be construed or used as a basis for investment or as a basis for any claims against AST.